The floor was not level
Tiles laid on an uneven screed rock, crack at the corners and leave raised edges you trip on. The base needs levelling first.
Our tiling services in Dubai cover floors, walls, bathrooms and kitchens, from a single cracked tile to a full room. Tiles fail at the base, not the surface, so the work starts with a level floor, waterproofing in wet areas and the right adhesive. Send photos on WhatsApp and we reply with a price.
Tiles are hard-wearing. When they fail, it is almost always because of what is underneath.
Tiles laid on an uneven screed rock, crack at the corners and leave raised edges you trip on. The base needs levelling first.
A few dabs of adhesive under each tile leaves air gaps. The tile sounds hollow when tapped and cracks under weight.
Large tiled floors expand in the heat. Without movement joints at the edges and across wide areas, they push up and crack.
Grout is not waterproof. Without a membrane underneath, water gets behind shower tiles and into the wall or the flat below.
Standard grout stains, cracks and grows mould in showers. Wet areas need grout made for water and a proper seal.
Before replacing a cracked tile we tap the tiles around it. If they sound hollow, the problem is the bond, and the fix is bigger than one tile. You hear that before you pay for anything.
Each area has its own rules. What works on a bedroom floor fails in a shower.
Porcelain and ceramic floor tiles for living areas, bedrooms and balconies, laid level with the right joints.
Walls and floors in wet areas, with a waterproof membrane, a fall to the drain and grout made for water.
Tiled splashbacks behind hobs and sinks that wipe clean and stand up to heat and steam.
Cracked or loose tiles replaced, tired grout raked out and renewed, and silicone joints resealed.
Most of the work that decides how long tiles last happens before the first tile goes down.
Send photos and rough sizes on WhatsApp. We reply with a price or book a visit to measure.
We raise building approval where needed and confirm the tiles, adhesive and grout with you.
Old tiles removed if needed, the floor levelled and wet areas waterproofed.
Tiles laid on full adhesive cover, with movement joints, then grouted.
Silicone at edges and corners, tiles cleaned and checked with you.
Laying new tiles over old ones is quicker and less messy, and sometimes it is the right call. Sometimes it just buries the problem. We check which before we quote.
It depends on the area, the tile, the state of the floor or wall and whether old tiles need removing. Send photos and rough measurements on WhatsApp and we reply with a price.
Usually, yes, if you have a spare or we can find a match. We tap the tiles around it first, because a hollow-sounding area means a wider bond problem.
We can supply them, or fit tiles you have chosen yourself. If you buy your own, order a few extra for cuts and breakages.
It depends on the size and whether the old tiles and waterproofing need removing. We give you the number of days with the quote, including drying time.
For removing old tiles or any noisy, dusty work, most Dubai towers ask for approval. We raise it with building management for you.
Most of Dubai, including Deira, Bur Dubai, Al Nahda, Al Qusais, Al Barsha, Dubai Marina, JLT, Business Bay, Mirdif and Silicon Oasis, with no travel charge inside any of them.
No travel charge inside any of these areas.
Photos of the area, rough measurements and the tiles you have in mind are enough to start. Mention any cracked, loose or hollow tiles, and we reply on WhatsApp with a price.
A new bathroom floor often needs a plumber first and a door trimmed after. Booked together, the trades follow each other.
